Sump Enclosure III

AquaGuard Waterproofing Corporation completely messed up the sump pump installation from start to finish When performing basement waterproofing in our home their sorry excuse for a work crew failed in practically every way to prepare the basement sub-flooring for the installation of the sump pump enclosure.  The following posting describes yet another example of the faulty work done in my home.

We’ll start with the preparation of the ground for the sump basin.  As the Arbitrator noted: “One of the pits also had a 5″ deep void underneath, rather than resting on solid material”.  That is one of several defects in the basement waterproofing workmanship.  As shown in the figure above, provided with permission by Zoeller Pump Company, the entire enclosure or basin is surrounded by materials other than the foundation dirt.  (Reference Basin Installation Instructions).  In the reference you’ll find the following instructions:

“Dig a hole for the basin.  The basin should be located in a very low traffic area proximate to an appropriate electrical outlet.  The hole should be at least 8″ larger in diameter than the basin in order to leave 4″ of backfill all the way around the perimeter.  A minimum of 4″ of compacted subbase is also required.  Backfill and subbase should be 1/8″ to 3/4″ pea gravel or 1/8″ to 1/2″ crushed stone.”

There are multiple websites where the procedures for installing a basin are described, some with excellent diagrams to help understanding of the various steps.  An example can be found at Wikihow.com (See www.wikihow.com/Install-a-Basement-Sump).  In that example the hole size is described as being a gap 3″ to 4″ around the basin.  The article also recommends digging the hole 12″ deeper than the length of the basin.  The gap between the basin and the foundation dirt will be filled in with gravel, and then sealed at the top with concrete.

While the exact dimensions are subject to debate.  I’m not a waterproofing expert and I cannot give expert advice in this area.  However, all the sites I’ve seen and the all the water professionals I spoken to are in agreement that the basin should be surrounded by something other than the original foundation dirt.  At this time it is hard to see exactly what AquaGuard’s subcontractor did, but not for long.  I’m having the entire interior system ripped out as it is utterly useless.  When the AquaGuard-installed basins are removed, I will take pictures and post the results, but I can save you the suspense.  As the arbitrator noted, there is at least one void at the base of the enclosure.  In addition, there are numerous holes that they drilled in the side walls of the basin which allowed me to probe around the enclosure.  These probes indicate that the sides of the basin below the trench path entrances are nothing other than the original compacted foundation dirt.

Who can be surprised?  Shoddy workmanship and taking shortcuts are a recurring theme.  As I’ve noted in past postings, it is actually hard to find anything AquaGuard’s workcrew did that was up to industry standards.

In following posts we’ll describe in detail other issues associated with the basin installation as provided by AquaGuard’s subcontractor.  Specifically we’ll look at how various openings were made in the enclosure.  While some of these are necessary to allow, for example, the drain pipes access to the basin, others are of a more questionable nature.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: